My "To Do" list for 2014 Q2 is going to be short and sweet. I have two turquoise quilt tops (shown above) that I would love to get done. They need to be basted, quilted, and bound. I also have a "mega block" log cabin quilt top that is in the same boat. It needs to be basted, quilted, and bound.
This quarter I will also be working on the 4 quilts that I am making for a bunk room, but I have decided that rather than finish one completely before starting the second, I want to finish all the tops before I begin quilting. I want to quilt them similarly and want to choose a style and thread color that will suit them all. I mentioned these quilts in my Q1 To Do list post. I have finished the purple flying geese quilt top, and have the green bear paw print one up on my design board. Progress! However there's no way I can finish them all this quarter, so I will put them on my Q3 list. Thanks for stopping by!
0 Comments
Leave a Reply. |
Archives
November 2023
|